Background

Agnico-Eagle was seeking an experienced partner to manage the cost and construction of surface and underground infrastructure. The entire project had to be completed according to a pre-determined schedule.

Work performed

ASDR deployed a team of highly skilled professionals to ensure the project’s success. ASDR’s professionals were present throughout the entire project over a period of more than three years.

Performance and results

  • Avoided cost overruns and met timelines in a context of optimal health and safety;
  • Developed a relationship of trust with the client;
  • Ensured the long-term performance of work at Agnico-Eagle’s mine and other mining operations; and
  • Overall assessment:  $800 M