Éléonore Mine

Client : Goldcorp

Service : Surface and Underground Construction and Infrastructure Management

Background

The client needed to build a world-class underground gold mine within four years to process gold ore and boost its daily capacity to 7,000 tonnes. It was seeking a partner to join its team to manage and engineer the underground infrastructure.

water-treatment-engineering-mine-underground-dewatering
mining-mines-water-treatment-ventilation
maintenance-mining-shutdowns-underground-mines

Work Performed

ASDR provided a team of highly skilled professionals to complete the project:

  • Construction project management;
  • Mechanical, electrical, civil and pipefitting supervision;
  • Cost management;
  • Schedule management;
  • Engineering:
    • Ventilation;
    • Surface garage, mine;
    • Ramp portal;
    • Fuel distribution line;
    • Underground loading station;
    • Ore bin, screen and conveyor;
    • 5,000-gpm pumping station;
    • Ventilation door;
    • Refuge;
    • Explosives station;
    • Mine captains;
    • OHS;
    • MRS; and
    • Operators and wastewater treatment plant.

Performance and results

  • Reduced the budget allowance in a context of optimal health and safety.
  • Built a relationship of trust with the client.
  • Overall assessment:  $1 billion.

Need more info?

Stephen Authier
President
[email protected]
Tél. : (819) 757-3039 post 10302